Get new jobs by email
  •  ...competitive scoping methodologies with minimum disruption to existing production. Main Accountabilities 1. Lead, coordinate, monitor and...  ...key study deliverables and key project decisions are properly documented, signed off, and retained; Identify: PIN, cost estimate &... 

    AEWA

    Bonny, Rivers
    25 days ago
  •  ...competitive scoping methodologies with minimum disruption to existing production. Main Accountabilities 1) Coordinate, monitor and...  ...key study deliverables and key project decisions are properly documented, signed off, and retained; Identify: PIN, cost estimate &... 

    AEWA

    Bonny, Rivers
    25 days ago
  •  ...competitive scoping methodologies with minimum disruption to existing production. MAIN ACCOUNTABILITIES # Assist, monitor and manage the...  ...key study deliverables and key project decisions are properly documented, signed off, and retained; Identify: PIN, cost estimate &... 

    AEWA

    Bonny, Rivers
    25 days ago
  •  ...design & engineering requirements, to provide the initial electrical engineering discipline requirements and inputs into Project documents such as BfD, PES, BDEP, DED, ITT etc, in close coordination with other technical disciplines to ensure an integrated delivery. 3... 

    AEWA

    Bonny, Rivers
    23 days ago
  •  ...design & engineering requirements, to provide the initial Instrument engineering discipline requirements and inputs into Project documents such as BfD, PES, BDEP, DED, ITT etc, in close coordination with other technical disciplines to ensure an integrated delivery. 3... 

    AEWA

    Bonny, Rivers
    23 days ago
  •  ...design & engineering requirements, to provide the initial mechanical engineering discipline requirements and inputs into Project documents such as BfD, PES, BDEP, DED, ITT etc, in close coordination with other technical disciplines to ensure an integrated delivery. 3... 

    AEWA

    Bonny, Rivers
    23 days ago
  •  ...Knowledge ~ Piping and valve systems design - Working Knowledge ~ Turnaround Preparation & Planning - Working Knowledge ~ Operate Production Assets - Awareness and Basic Understanding ~ Cost Estimating - Working Knowledge ~ Manage Strategic and Front-End Processes -... 

    AEWA

    Bonny, Rivers
    a month ago
  •  ...schedule. Consolidate the impact of approved changes and any deviations from the key project targets and milestones, including productivity monitoring and “What if scenarios” to aid project management decision-making. Build Project database using appropriate tools such... 

    AEWA

    Bonny, Rivers
    a month ago