Get new jobs by email
  •  ...Responsibilties Review discipline Inspection and test plans (ITPs) and related quality control plans. Ensure that only the latest design documents (AFC) are used at the work site Witness and monitor the contractor's work activities, inspection and test in accordance... 

    Amaiden Energy Nigeria Limited

    Bonny, Rivers
    4 days ago
  •  ...Knowledge of QA/QC systems & ISO standards Proficiency in material testing & civil inspection Familiarity with quality control documentation Experience with NDT or relevant testing methods Behavioural Competencies: Strong attention to detail & analytical... 

    Mega Star Technical and Construction Company

    Bonny, Rivers
    4 days ago
  •  ...key study deliverables and key project decisions are properly documented, signed off, and retained; Identify: PIN, cost estimate & schedule...  ...Contracts & procurement, performance monitoring, and project control. Other Job Requirements Mentor, coach, and support... 

    AEWA

    Bonny, Rivers
    6 days ago
  •  ...mechanical engineering discipline requirements and inputs into Project documents such as BfD, PES, BDEP, DED, ITT etc, in close coordination...  ...to Project Conrols & Assurance Plan (PCAP) for mechanical control points as well as integrated assurance input to other disciplines... 

    AEWA

    Bonny, Rivers
    4 days ago
  •  ...Instrument engineering discipline requirements and inputs into Project documents such as BfD, PES, BDEP, DED, ITT etc, in close coordination...  ...to Project Conrols & Assurance Plan (PCAP) for Instrument control points as well as integrated assurance input to other disciplines... 

    AEWA

    Bonny, Rivers
    4 days ago
  •  ...key study deliverables and key project decisions are properly documented, signed off, and retained; Identify: PIN, cost estimate & schedule...  ...~ Problem Solving & Communication ~  Planning and Budget Control ~  Manage Contractor Performance ~  Resource & Schedule... 

    AEWA

    Bonny, Rivers
    6 days ago
  •  ...electrical engineering discipline requirements and inputs into Project documents such as BfD, PES, BDEP, DED, ITT etc, in close coordination...  ...to Project Conrols & Assurance Plan (PCAP) for electrical control points as well as integrated assurance input to other disciplines... 

    AEWA

    Bonny, Rivers
    4 days ago
  •  ...Job Purpose/Objective To support the implementation of an effective HSE Management System & risk controls and provide complete HSE support to the Project Delivery Teams and Projects contractors to effectively implement all HSE critical processes & Integrated Safe... 

    AEWA

    Bonny, Rivers
    a month ago
  •  ...apply standard project management tools and techniques, including supporting resources, to accurately scope, plan, cost, execute and control projects to meet approved objectives as in the FID. Contribute to the evolution of standardised work processes, tools, best... 

    AEWA

    Bonny, Rivers
    25 days ago
  •  ...inputs and supervision of civil engineering and construction projects.   Duties & Responsibilities 1. Prepare, monitor and control the overall monthly project civil construction planning to ensure construction assurance activities and integrative Site Execution... 

    AEWA

    Bonny, Rivers
    25 days ago
  •  ...Review drawings to ensure alignment with Client’s approved procedures and applicable standards. Produce technical drawings and documentation on AutoCAD to support handover activities as required from projects and discipline in accordance with the client's asset... 

    Amaiden Energy Nigeria Limited

    Bonny, Rivers
    4 days ago
  •  ...Job Purpose/Objective To implement the overall strategy of how project work process is to be broken down for control and how the control is to be managed and ensuring processes, framework and tools are in place to provide and manage project plans and schedules required... 

    AEWA

    Bonny, Rivers
    25 days ago
  •  ...learnings from proactive observations and incidents. 5) Ensure key study deliverables and key project decisions are properly documented, signed off, and retained; Identify: PIN, cost estimate & schedule; Assess: premise document and feasibility report; Select: Project... 

    AEWA

    Bonny, Rivers
    6 days ago