Get new jobs by email
  •  ...commissioning, and handover activities. Develop appropriate reports as required for specific assigned tasks in an accurate and timely fashion. Carry out all other activities assigned by the supervisor and Line head. Requirements Graduate Degree in Engineering... 

    Amaiden Energy Nigeria Limited

    Bonny, Rivers
    4 days ago
  •  ...implement all HSE critical processes & Integrated Safe Systems of Work (ISSOW) at the “coalface”, resulting in an injury and loss-free on time, schedule, and on quality Project delivery. Duties & Responsibilities # Provide overall support for the HSE program and... 

    AEWA

    Bonny, Rivers
    a month ago
  •  ...quality delivery of own portfolio of projects, including appropriate Management Information Systems to provide accurate, regular and timely performance feedback to Management and Shareholders. 5. Responsible for managing the TECOP risks and opportunities to deliver... 

    AEWA

    Bonny, Rivers
    26 days ago
  •  ...work scope definition, Project Specifications, selection of standards & requirements, necessary to enable the business take proper & timely decision. 8) Identify required change(s) and corresponding impact on existing system, as part of the mechanical engineering... 

    AEWA

    Bonny, Rivers
    4 days ago
  •  ...work scope definition, Project Specifications, selection of standards & requirements, necessary to enable the business take proper & timely decision. 8) Identify required change(s) and corresponding impact on existing system, as part of the electrical engineering... 

    AEWA

    Bonny, Rivers
    4 days ago
  •  ...Prevention of Major Accident Hazards: SIFp (Serious Injury &  Fatality Potential) Reduction; Closure of Process Safety Actions (PSA) on Time; Bow-Tie Quality (as applicable) & Barrier Health Monitoring- 100% critical barriers tracked; ~ HAZOP/LOPA Findings Closure Rate-... 

    AEWA

    Bonny, Rivers
    a month ago
  •  ...Quality issues at end of defect rectification period Cost predictability - Design and construction costs to implement change orders Time predictability - Time for construction versus baseline Cycle time from the discovery of a control deficiency to a risk acceptance... 

    AEWA

    Bonny, Rivers
    26 days ago
  •  ...work scope definition, Project Specifications, selection of standards & requirements, necessary to enable the business take proper & timely decision. 8) Identify required change(s) and corresponding impact on existing system, as part of the Instrument engineering... 

    AEWA

    Bonny, Rivers
    4 days ago
  •  ...manage project plans and schedules required to execute PD Capex projects maximizing efficiency of project strategy with respect to cost, time, risk and opportunity management. To take responsibility for the implementation, maintenance, and delivery of the planning... 

    AEWA

    Bonny, Rivers
    26 days ago