Get new jobs by email
  •  ...activity areas and consistently manage Personal Safety Risks to As Low As Reasonably Practicable (ALARP), preventing harm to personnel....  ...of an ISO 45001 and HSE Control Framework compliant, level-1 HSE management system (HSE-MS) in all activities within the site... 

    AEWA

    Bonny, Rivers
    a month ago
  •  ...to demonstrate that identified business risks are managed to As-Low-As-Reasonably-Practicable (ALARP) where required, in line with company...  ...are critical. Candidate with Shell TA-3 technical authority level will be an added advantage. The candidate shall be Registered... 

    AEWA

    Bonny, Rivers
    3 days ago
  •  ...to demonstrate that identified business risks are managed to As-Low-As-Reasonably-Practicable (ALARP) where required, in line with company...  ...Requirements Job Requirements Education A university-level degree in Electrical & Electronics Engineering or other related... 

    AEWA

    Bonny, Rivers
    3 days ago
  •  ...to demonstrate that identified business risks are managed to As-Low-As-Reasonably-Practicable (ALARP) where required, in line with company...  ...Requirements Job Requirements Education A university-level degree in Electrical Engineering or other related engineering... 

    AEWA

    Bonny, Rivers
    3 days ago
  •  ...Assessment, Project Schedule and Cost Estimate to support the project to Define Phase. Delivers credible/technically sound (screening level) development concept ensuring integration of the full TECOP spectrum of risk and uncertainty into the preparation of cost, schedule... 

    AEWA

    Bonny, Rivers
    6 days ago
  •  ...flight equipment checks for all platforms – Supervise field team of Onshore Drone Analysts – Enforce go/no-go criteria—weather, H2S levels, access restrictions – Lead daily toolbox talks and safety briefings – Report all near-misses and safety observations to client... 

    Amaiden Energy Nigeria Limited

    Bonny, Rivers
    3 days ago
  •  ...Assessment, Project Schedule and Cost Estimate to support the project to Define Phase. Delivers credible/technically sound (screening level) development concept ensuring integration of the full TECOP spectrum of risk and uncertainty into the preparation of cost, schedule... 

    AEWA

    Bonny, Rivers
    6 days ago
  •  ...Work with ERC department focal to consult the land registry and/or equivalent Government databases, particularly at local and state levels to ascertain veracity of claims on RoW. · Assist to deepen ERC departments understanding of the local practices on land tenure... 

    AEWA

    Bonny, Rivers
    25 days ago
  •  ...Monitor Contractor Completions Management process and verify reports. Requirements B.Sc. in Civil Engineering. Minimum Level II NACE or SSPC Coating Inspector Certificate. Experience: ~4 - 5 years experience in the inspection of coating, insulation, refractory... 

    Amaiden Energy Nigeria Limited

    Bonny, Rivers
    3 days ago
  •  ...Assessment, Project Schedule and Cost Estimate to support the project to Define Phase. Delivers credible/technically sound (screening level) development concept ensuring integration of the full TECOP spectrum of risk and uncertainty into the preparation of cost, schedule... 

    AEWA

    Bonny, Rivers
    5 days ago