Get new jobs by email
  •  ...assigned projects comply with applicable codes, standards, and industry best practices, with a strong emphasis on safety and reliability...  ...potential impacts on project philosophy and existing design. Draft proposal for review & approval, on design changes and/or other... 

    AEWA

    Bonny, Rivers
    8 days ago
  •  ...assigned projects comply with applicable codes, standards, and industry best practices, with a strong emphasis on safety and reliability...  ...potential impacts on project philosophy and existing design. Draft proposal for review & approval, on design changes and/or other... 

    AEWA

    Bonny, Rivers
    8 days ago
  •  ...assigned projects comply with applicable codes, standards, and industry best practices, with a strong emphasis on safety and reliability...  ...potential impacts on project philosophy and existing design. Draft proposal for review & approval, on design changes and/or other... 

    AEWA

    Bonny, Rivers
    8 days ago
  •  ...Reliability Engineering will be an advantage. At least 5 years should have been spent in a similar position in the oil and gas industry. Ability to interface with Engineering, Assets, Operations, Maintenance, Technology and HSE are critical. Competency Requirements... 

    AEWA

    Bonny, Rivers
    10 days ago
  •  ...changing external influences and security levels. Fire-fighting and Prevention system. Able to develop and implement Oil and Gas & Industry policies, strategies, and standards Information Technology Literate. Personal effectiveness, Team player, & Problem Solving... 

    AEWA

    Bonny, Rivers
    a month ago
  •  ...construction and 3-5 yeas in a principal role or in a similar role for portfolio of projects and good knowledge of the Oil and Gas industry ~ Previous experience in community relations, public relations, or a related field. ~ Experience in conducting land surveys... 

    AEWA

    Bonny, Rivers
    29 days ago
  •  ...Revisions (Increases) during Project Life (i.e Project cost Growth = Project Cost at DG3) ~ Scope, schedule and Cost compared to Industry average (i.e Execution Duration Index = Project duration / Industry Average Project Duration, Project Cost Index = Project Cost $... 

    AEWA

    Bonny, Rivers
    10 days ago
  •  ...construction and 3-5 yeas in a principal role or in a similar role for portfolio of projects and good knowledge of the Oil and Gas industry.   Competences Stakeholder Engagement Management - Awareness and Basic Understanding Nigerian Content Execution -... 

    AEWA

    Bonny, Rivers
    29 days ago
  •  ...construction and 3-5 yeas in a principal role or in a similar role for portfolio of projects and good knowledge of the Oil and Gas industry, having have been spent as Project Leader of a $50 million - $150 million project or a portfolio of projects with the same value... 

    AEWA

    Bonny, Rivers
    29 days ago
  •  ...years in a Principal/Senior Planning and Scheduling role for portfolio of pipeline projects and good knowledge of the Oil and Gas industry.   Generic Competences Strategic and motivational Leadership (K) People Management (K) Commercial Mindset/Cost consciousness... 

    AEWA

    Bonny, Rivers
    29 days ago