Get new jobs by email
  •  ...Job Summary   The candidate will deliver electrical engineering assurance services within the Corporate Engineering function, supporting...  ..., providing assurance input to Project Conrols & Assurance Plan (PCAP) for electrical control points as well as integrated assurance... 

    AEWA

    Bonny, Rivers
    1 day ago
  •  ...authority, providing assurance input to Project Conrols & Assurance Plan (PCAP) for Instrument control points as well as integrated...  ...Job Requirements Education A university-level degree in Electrical & Electronics Engineering or other related engineering degree... 

    AEWA

    Bonny, Rivers
    1 day ago
  •  ...on people and the environment 2. Lead, coordinate delivery of rejuvenation projects derived from the various disciplines master plans, by organizing technical discipline engineering analysis of viable options to arrive at engineering solutions reviewed by Technical... 

    AEWA

    Bonny, Rivers
    4 days ago
  •  ...acquisition quality – Liaise with Affiliate Lead on scheduling and resources requirements Daily Site Progress Report Mission Flight Plan & Risk Assessment AUSEA Mission Report (HQ format) Drone Flight Route Report – Raw Datasets LiDAR, AUSEA, RGB, IR –... 

    Amaiden Energy Nigeria Limited

    Bonny, Rivers
    1 day ago
  •  .... 2) Develop and execute key decisions & comprehensive roadmaps and coordinate the execution of fully integrated technical work plan and management systems for some of the opportunities, inclusive of all contributions irrespective of disciplines. 3) Owns and manages... 

    AEWA

    Bonny, Rivers
    4 days ago
  •  ...legislated standards for Health, Safety, and Environment. # Ensure consistent implementation and monitoring of the Project/Contractor HSE Plan activities during the execution phase. # Ensure implementation of an effective HSE Management System & risk controls and provide... 

    AEWA

    Bonny, Rivers
    29 days ago
  •  ...legal descriptions of surveyed lands. · Collaborate with Projects department to provide accurate land data and support project planning and execution. · Ensure all surveying activities comply with legal, professional, and ethical standards. · Analyze data... 

    AEWA

    Bonny, Rivers
    23 days ago
  •  ...Rate- % closure within agreed timeframe etc. ~ Zero Tier 1/2 Process Safety Incidents during CSU. ~% of HSE PCAP & HSE Activity Plan deliverables identified correctly and closed before target dates ~100% attendance and action follow-up compliance for Design Reviews... 

    AEWA

    Bonny, Rivers
    29 days ago
  •  ...Responsibilties Review discipline Inspection and test plans (ITPs) and related quality control plans. Ensure that only the latest design documents (AFC) are used at the work site Witness and monitor the contractor's work activities, inspection and test in accordance... 

    Amaiden Energy Nigeria Limited

    Bonny, Rivers
    1 day ago
  •  ...impact on people and the environment # Support the delivery of rejuvenation projects derived from the various disciplines master plans, by organizing technical discipline engineering analysis of viable options to arrive at engineering solutions reviewed by Client Technical... 

    AEWA

    Bonny, Rivers
    3 days ago
  •  ...Job Purpose/Objective   To develop and implement effective construction strategy, plans and procedures to ensure the Project Delivery Department has the necessary resources and competencies to achieve consistent and effective standards of discipline engineering... 

    AEWA

    Bonny, Rivers
    23 days ago
  •  ...project organization and in the capacity of a responsible technical authority, providing assurance input to Project Conrols & Assurance Plan (PCAP) for mechanical control points as well as integrated assurance input to other disciplines. 5) Guide and support development... 

    AEWA

    Bonny, Rivers
    1 day ago
  •  ...Job Purpose/Objective   · Initiate, plan and execute approved pipeline projects along the assigned point GTS- Gas Transmission Systems, and Right of Way to agreed standards (Cost, Schedule, Quality), ready to operate as defined in each project’s premise while... 

    AEWA

    Bonny, Rivers
    23 days ago
  •  ...control and how the control is to be managed and ensuring processes, framework and tools are in place to provide and manage project plans and schedules required to execute PD Capex projects maximizing efficiency of project strategy with respect to cost, time, risk and opportunity... 

    AEWA

    Bonny, Rivers
    23 days ago