Get new jobs by email
  •  ...Engineering function, supporting Project Delivery to achieve error-free designs, on-schedule execution, and flawless project outcomes. This role...  ...potential impacts on project philosophy and existing design. Draft proposal for review & approval, on design changes and/or other... 

    AEWA

    Bonny, Rivers
    7 days ago
  •  ...Engineering function, supporting Project Delivery to achieve error-free designs, on-schedule execution, and flawless project outcomes. This role...  ...potential impacts on project philosophy and existing design. Draft proposal for review & approval, on design changes and/or other... 

    AEWA

    Bonny, Rivers
    7 days ago
  •  ...Engineering function, supporting Project Delivery to achieve error-free designs, on-schedule execution, and flawless project outcomes. This role...  ...potential impacts on project philosophy and existing design. Draft proposal for review & approval, on design changes and/or other... 

    AEWA

    Bonny, Rivers
    7 days ago
  •  ...: PIN, cost estimate & schedule; Assess: premise document and feasibility report; Select: Project execution strategy and Basis for Design. 7. Consults / advises BOM(s) and DEs on other key project level deliverables and assumptions such as: HSSE & SP Register and Activity... 

    AEWA

    Bonny, Rivers
    9 days ago
  •  ...: PIN, cost estimate & schedule; Assess: premise document and feasibility report; Select: Project execution strategy and Basis for Design. 6) Consult and advise BOM(s) and DEs on updates to current projects, improvement initiatives status and projections, other key... 

    AEWA

    Bonny, Rivers
    9 days ago
  •  ...Responsibilities # Coordinating the necessary safety studies, ALARP demonstrations and development of the  safety case in Detailed Design. # Educating the Project, Asset and Contractor teams in the outcome of the safety studies and ensuring these are incorporated in... 

    AEWA

    Bonny, Rivers
    a month ago
  •  ...: PIN, cost estimate & schedule; Assess: premise document and feasibility report; Select: Project execution strategy and Basis for Design. KEY PERFORMANCE INDICATORS ~ Scope, Schedule and Budget Revisions (Increases) during Project Life (i.e Project cost Growth... 

    AEWA

    Bonny, Rivers
    9 days ago
  •  ...implement the approved HSSE Framework for capital projects; be accountable for own portfolio of projects to be executed safely in design and construction and provide assurance that they will operate safely during and after start-up. 7. Support, coach, develop and... 

    AEWA

    Bonny, Rivers
    28 days ago
  •  ...Constructability, Construction Hazard Identification (HAZID) activities are effectively covered during Select, Front End Engineering Design, Execute and Handover. 4. Prepare and monitor monthly project and construction management planning (workface planning and Path... 

    AEWA

    Bonny, Rivers
    28 days ago