Get new jobs by email
  •  ...4) Demonstrate HSSE Leadership, champion Project Risks and Process Safety accountabilities and manage competences of HSSE critical...  ...assessment of equipment status and life based on available or limited data;  development of a scope and program based on evolving science and... 

    AEWA

    Bonny, Rivers
    27 days ago
  •  ...the mechanical engineering studies and Management of Change (MOC) process. Propose for review & approval, design changes where required,...  ...analysis with the use of Caesar II. Collect and analyse vibration data and other equipment operating parameters. Report abnormal... 

    AEWA

    Bonny, Rivers
    24 days ago
  •  ...approvals are properly closed out # Coordinates Assurance Review Process including setting-up Peer Assists ITRs, VARs for the various...  ...assessment of equipment status and life based on available or limited data; development of a scope and program based on evolving science... 

    AEWA

    Bonny, Rivers
    26 days ago
  •  ...into the preparation of cost, schedule and resources estimates. 5. Demonstrate HSSE Leadership, champion Production Risks and Process Safety accountabilities and manage competences of HSSE critical resources to safely operate and manage assets. Drive the review of... 

    AEWA

    Bonny, Rivers
    27 days ago
  •  ...change(s) and corresponding impact on existing system, as part of the Instrument engineering studies and Management of Change (MOC) process. Propose for review & approval, design changes where required, in line with company MOC procedure. 9) Support in identification... 

    AEWA

    Bonny, Rivers
    24 days ago
  •  ...change(s) and corresponding impact on existing system, as part of the electrical engineering studies and Management of Change (MOC) process. Propose for review & approval, design changes where required, in line with company MOC procedure. 9) Support in identification... 

    AEWA

    Bonny, Rivers
    24 days ago